Profile Output Table - WISE TXT
HEC-RAS  Plan: Multiple   River: POST OAK POST OA   Reach: Reach-1
                                                             
# Rivers            = 1 
# Hydraulic Reaches = 1 
# River Stations    = 3 
# Plans             = 1 
# Profiles          = 7 

 Reach            River Sta        W.S. Elev    Q Total 
                                        (ft)      (cfs) 
                                                             
 Reach-1          2243                544.70      98.00 
 Reach-1          2243                545.42     390.00 
 Reach-1          2243                544.86     126.00 
 Reach-1          2243                544.92     154.00 
 Reach-1          2243                544.96     174.00 
 Reach-1          2243                545.12     196.00 
 Reach-1          2243                545.24     247.00 
                                                        
 Reach-1          1800                538.13      98.00 
 Reach-1          1800                538.89     390.00 
 Reach-1          1800                538.23     126.00 
 Reach-1          1800                538.31     154.00 
 Reach-1          1800                538.37     174.00 
 Reach-1          1800                538.44     196.00 
 Reach-1          1800                538.62     247.00 
                                                        
 Reach-1          1368                534.26      98.00 
 Reach-1          1368                534.96     390.00 
 Reach-1          1368                534.43     126.00 
 Reach-1          1368                534.51     154.00 
 Reach-1          1368                534.55     174.00 
 Reach-1          1368                534.60     196.00 
 Reach-1          1368                534.71     247.00 
                                                             
